St. Conrad Catholic

 / Site


Avinash Garde / Snyder Architects

St. Conrad Catholic

Avinash Garde, Principal

This replacement school was funded under the prohibitive to repair funding model and had to be built while the existing school was also operating on the same site. The construction was phased so that the new building was built on the existing play area while the existing building continued to operate. When the new building was complete, the school moved into the new structure, the existing school was demolished and the space converted into the new play ground.